首頁 > Job References > Hotel and Office > Kerry Central Mixed-use Development (Nanchang)
Kerry Central Mixed-use Development (Nanchang)
Project Name: Kerry Central Mixed-use Development (Nanchang)
Type: LV / MCC / LMCP / Dist. BD
Switch Qty: 4 x 4000A, 4 x 3200A, 5 x 2500A, 5 x 2000A, 13 x 1600A, 3 x 1250A, 3 x 1000A, 3 x 800A
Installation: Jiangsu Provincial Industrial Equipment Installation Group Co., Ltd.
Design Institute/Consultant: Meinhardt (M&E) Ltd.
Completion Date: 12/2015
Type: LV / MCC / LMCP / Dist. BD
Switch Qty: 4 x 4000A, 4 x 3200A, 5 x 2500A, 5 x 2000A, 13 x 1600A, 3 x 1250A, 3 x 1000A, 3 x 800A
Installation: Jiangsu Provincial Industrial Equipment Installation Group Co., Ltd.
Design Institute/Consultant: Meinhardt (M&E) Ltd.
Completion Date: 12/2015